久久婷婷五月综合色奶水99啪-男ji大巴进入女人的视频小说-久久在精品线影院-欧美怡红院免费全部视频-亚洲av永久无码精品国产精品

Waste Incinerator

The North District waste incinerator was completed and put into use in 2017, designed for 1.5 million calories/hour; the treatment process is "incineration + baghouse + HCl absorption tower + scrubbing tower"; two sets of on-line monitoring systems have been installed at the exauhst vent.

Solid Salt Incinerator

The solid salt incinerator in the South Zone was completed and put into use in 2019; the design capacity is 3.5 million calories/hour; two online monitoring systems were installed at the exhaust vent.

Sewage Treatment System

Hungpai Science and Technology Park has built a sewage treatment system with a design capacity of 3,000 tons/day, and has installed a set of sewage online monitoring system.

High-Temperature Incineration

A set of high-temperature incineration treatment device was designed to handle capacity of 4.5 million calories/hour, to support the exhaust gas treatment. It was improved on the existing incinerator device, to treat the organic exhaust deeply. VOC emission concentration is been halved to 40mg/m3.